Construction & Civil Engineering Issue 232 - November 2026 | Page 11

__________________________________________________________________________________________________ Supply
Chain
that used to be made by whoever was available are held to the same standard as those made at the top.
When these disciplines are in place, downtime falls by around 65 per cent and invoice queries stay below 1.5 per cent. When they are missing, both move sharply the other way.
Where technology fits
Technology has a big role to play here, but most of what the sector uses today was built for a different job. It records what went wrong: the late delivery, the disputed invoice, the missing note. Very little of it stops the failure happening in the first place.
The tools that make a difference work at the point of ordering. They make those disciplines automatic, so standards no longer depend on who places the order that day. And they give site and procurement the same live picture, so a problem is caught with a phone call in the morning rather than a dispute at month end. That is not technology replacing relationships. It is technology making sure the right ones are rewarded.
Civil engineering has inherited this problem for as long as anyone can remember. The fix is not better reporting or faster dispute resolution. It is getting the supplier decision right, every time. Do that, and projects stop inheriting the problem. ■
Neeral Shah www. yardlink. com
YardLink is a digital construction procurement platform that connects contractors with a nationwide network of trusted equipment hire and materials suppliers. By bringing procurement into one place, the company helps construction teams simplify ordering, improve cost control, and reduce delays. Yard- Link combines digital tools with customer support to create a more efficient, connected, and sustainable construction supply chain.
ccemagazine. com 11