Development
Refurbishment work typically carries limited planning exposure, established site conditions and a contained scope. Ground-up construction introduces full planning risk from the outset, along with Section 106 obligations, affordable housing requirements, and biodiversity net gain commitments, although the Autumn Budget announced an exemption for residential brownfield sites of up to 1.5 hectares, with timing still to be confirmed. Developers taking on ten or more units from October 2026 will also need to factor in the Building Safety Levy, and new build needs full building regulations sign-off at multiple stages, not a final inspection on a contained scope.
Construction insolvencies across England and Wales remain well above pre-pandemic levels, with developers often running into cost, timing or contractual difficulty they hadn’ t planned for. A developer with a strong record of delivering single-unit refurbishments on time and on budget can still underestimate what full planning risk and multi-stage regulatory sign-off actually demand of a programme and a balance sheet.
That’ s why the decision to move into ground-up shouldn’ t rest on confidence from previous projects alone. It needs an honest assessment of whether the team, the contractor relationship, and the capital structure are ready for a different category of risk.
What funders need to see
From a lending perspective, the information required for a ground-up scheme looks nothing like what’ s needed for a refurbishment. A credible funding package means a Red Book valuation, an executed building contract, a full cost plan with meaningful contingency and genuine equity at risk. Drawdowns are released against monthly site visits from a funder-appointed independent monitoring surveyor, not simply against invoices or a fixed schedule. That level of scrutiny is rarely needed on a light refurb.
Evidence of a reliable contractor is also essential. A lender wants to see a track record of delivery, not just a signed contract. That’ s a different test to the one most refurbishment developers have faced, where the developer and the tradesperson are often the same person.
Products structured for first-time developers exist precisely because this transition is common and because it can be funded well when the right controls are in place. The principle holds regardless of which lender a developer approaches: a groundup scheme needs a funding partner who understands the specific risks of the step up, not one applying refurbishment assumptions to a new build.
Approach the step up with the right partner
The pipeline from refurbishment to ground-up construction is one of the more encouraging developments in a sector that has spent years losing capacity. But it only delivers on that promise if developers approach the transition with the same discipline they’ ve applied to date, backed by a robust package, and a contractor whose delivery record stands up to scrutiny. Get those foundations right, and taking the step up to ground-up construction becomes a calculated decision rather than a leap of faith. ■
Hans Laud-Anderson www. assetzcapital. co. uk
Assetz Capital is a UK specialist property finance lender, established in 2013 to support businesses, property developers, and housebuilders with tailored funding solutions. Its portfolio includes development finance, commercial mortgages, bridging loans, and refurbishment finance, helping clients purchase, build, convert, and improve properties. Combining property expertise with flexible lending, Assetz Capital supports projects across the UK, with a particular focus on enabling SME developers to access finance and contribute to housing delivery.
ccemagazine. com 15