dimensional consistency, while reducing labour requirements and exposure to construction-site hazards.
Taking prefabrication a step further, the company’ s NTSROOM™ combines floor and roof systems into a coordinated, factory-built solution ready for installation on site. NTSROOM can enable a pair of semidetached houses to be installed in a day using a single delivery, crane, and installation plan. Its integrated design begins at a level wall plate and progresses towards a complete roof solution, without requiring high-level steels.
Factory preparation is particularly important to the system’ s efficiency. Floors are supplied with pre-drilled service openings, allowing pipes and cables to be installed without additional drilling on site. Each unit